HEX
Server: Apache/2.4.52 (Ubuntu)
System: Linux ip-172-31-4-197 6.8.0-1036-aws #38~22.04.1-Ubuntu SMP Fri Aug 22 15:44:33 UTC 2025 x86_64
User: ubuntu (1000)
PHP: 7.4.33
Disabled: pcntl_alarm,pcntl_fork,pcntl_waitpid,pcntl_wait,pcntl_wifexited,pcntl_wifstopped,pcntl_wifsignaled,pcntl_wifcontinued,pcntl_wexitstatus,pcntl_wtermsig,pcntl_wstopsig,pcntl_signal,pcntl_signal_get_handler,pcntl_signal_dispatch,pcntl_get_last_error,pcntl_strerror,pcntl_sigprocmask,pcntl_sigwaitinfo,pcntl_sigtimedwait,pcntl_exec,pcntl_getpriority,pcntl_setpriority,pcntl_async_signals,pcntl_unshare,
Upload Files
File: /var/www/web.enelar.com.co/node_modules/date-fns/differenceInCalendarDays.d.ts
/**
 * @name differenceInCalendarDays
 * @category Day Helpers
 * @summary Get the number of calendar days between the given dates.
 *
 * @description
 * Get the number of calendar days between the given dates. This means that the times are removed
 * from the dates and then the difference in days is calculated.
 *
 * @typeParam DateType - The `Date` type, the function operates on. Gets inferred from passed arguments. Allows to use extensions like [`UTCDate`](https://github.com/date-fns/utc).
 *
 * @param dateLeft - The later date
 * @param dateRight - The earlier date
 *
 * @returns The number of calendar days
 *
 * @example
 * // How many calendar days are between
 * // 2 July 2011 23:00:00 and 2 July 2012 00:00:00?
 * const result = differenceInCalendarDays(
 *   new Date(2012, 6, 2, 0, 0),
 *   new Date(2011, 6, 2, 23, 0)
 * )
 * //=> 366
 * // How many calendar days are between
 * // 2 July 2011 23:59:00 and 3 July 2011 00:01:00?
 * const result = differenceInCalendarDays(
 *   new Date(2011, 6, 3, 0, 1),
 *   new Date(2011, 6, 2, 23, 59)
 * )
 * //=> 1
 */
export declare function differenceInCalendarDays<DateType extends Date>(
  dateLeft: DateType | number | string,
  dateRight: DateType | number | string,
): number;